I'm using 7.0.0.1134 (following a fix for an FTP Upload issue) and I'm seeing issues when changing scheduled builds via FinalBuilder.
I had 4 builds scheduled to run nightly which worked perfectly. I disabled a build via Tool > Scheduler and advanced options but the build still ran the next day. I then deleted the build from the FinalBuilder scheduler and it still ran the next day (as per the original schedule).
Looking in the Windows XP Scheduler I can still see that the build I had set to disabled then tried deleted is still exists and is active.
Is this a known issue? Anything I can send you before I delete the build from the Windows XP Scheduler?
BTW - I haven't tried changing any other builds as they are in production use.
This is not a known issue and I have not been able to reproduce it at this stage.
Before you delete the scheduled task from the Windows scheduler, could you please open the scheduled task and take a screen shot of the Task, Schedule and Settings tab for this particular task and send them to me via support at finalbuilder dot com.
Also could you include in this email the which Windows Service Packs you have installed on this machine (i.e. XP Service Pack 3).
I’ve emailed the screenshots of the Windows scheduler to you @ support.
The machine is running Windows XP SP3 and is fully patched from Microsoft update.
Is there any debug from FB that can be seen when it lists the schedules as the schedule is missing from FB but can be seen from the Windows task scheduler.