# Run stages simultaneously

**URL:** https://www.finalbuilder.com/forums/t/run-stages-simultaneously/5477
**Category:** Discussion
**Created:** [May 4, 2016, 10:37am UTC](https://www.finalbuilder.com/forums/t/run-stages-simultaneously/5477 "2016-05-04T10:37:14Z")
**Posts on this page:** 1
**Showing post:** 6

<div class="post-metadata">

### Author: ![ktopaz](https://www.finalbuilder.com/forums/user_avatar/www.finalbuilder.com/ktopaz/32/2390_2.png) [@ktopaz](https://www.finalbuilder.com/forums/u/ktopaz)
#### Post date: [November 3, 2021, 11:16am UTC](https://www.finalbuilder.com/forums/t/run-stages-simultaneously/5477/6 "2021-11-03T11:16:36Z")

</div>

I suggested a similar solution to a different requirement we used to have:

> [@Trigger configuration only if multiple different configurations finished successfully](https://www.finalbuilder.com/forums/t/trigger-configuration-only-if-multiple-different-configurations-finished-successfully/6997):
>
> Hi Guys, I’d like to trigger a configuration to run only if X other configurations finished running successfully beforehand. Is this possible?

It worked very well.

---

_[View the full topic](https://www.finalbuilder.com/forums/t/run-stages-simultaneously/5477)._
