# Is a included project loaded as soon as

**URL:** https://www.finalbuilder.com/forums/t/is-a-included-project-loaded-as-soon-as/219
**Category:** Discussion
**Created:** [October 8, 2006, 6:26am UTC](https://www.finalbuilder.com/forums/t/is-a-included-project-loaded-as-soon-as/219 "2006-10-08T06:26:39Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![devrieskok](https://www.finalbuilder.com/forums/letter_avatar_proxy/v4/letter/d/ecc23a/32.png) [@devrieskok](https://www.finalbuilder.com/forums/u/devrieskok)
#### Post date: [October 8, 2006, 6:26am UTC](https://www.finalbuilder.com/forums/t/is-a-included-project-loaded-as-soon-as/219/1 "2006-10-08T06:26:39Z")

</div>

Hi All,  
  
I’m wondering. Is a included FinalBuilder project loaded and locked bij FinalBuilder at the same time as the project holding the included project is loaded?  
  
What I do is, in the “Main” project I sync the included project just before running the Include FinalBuilder Project Action. From the behaviour of a particular run of the Main Project I get the impression that the Included project did not update through the Perforce force sync.  
  
Regards  
Alfred de Vries

---

<div class="post-metadata">

### Author: ![Vincent](https://www.finalbuilder.com/forums/user_avatar/www.finalbuilder.com/vincent/32/938_2.png) [@Vincent](https://www.finalbuilder.com/forums/u/Vincent)
#### Post date: [October 9, 2006, 2:15am UTC](https://www.finalbuilder.com/forums/t/is-a-included-project-loaded-as-soon-as/219/2 "2006-10-09T02:15:59Z")

</div>

Hi Alfred  
  
The included projects is loaded at runtime only, and only when the action actually runs. It is loaded, executed and then unloaded.